Skip to content

EWC code 17 02 02

glass

Waste catalogue code3 listings

Identification table for code 17 02 02

EWC code
17 02 02
Hazardous
No
Sub-chapter
17 02 — Wood, glass and plastic
Common name
Site glass, discarded glazing and glazed window frames.
Who produces it
Construction firms, demolition and refurbishment sites, window fabricators, glazing contractors.
Examples
Panes from replaced windows, dismantled insulating glass units, discarded glazing, removed facade glass, installation offcuts.

Code 17 02 02 identifies glass produced by construction and demolition: panes from replaced windows, dismantled insulating glass units, removed glazing and facade glass, installation offcuts. It is produced by building contractors, demolition and renovation sites, window and door fabricators and glazing installers. In 2022 construction in the EU generated 862.2 million tonnes of waste, of which 0.9 million tonnes of glass, according to Eurostat.

As of 25 November 2026, Sfridoo has 3 published listings with waste code 17 02 02. By legal classification: 3 as waste. Most frequent provinces: Barletta Andria Trani (1), Monza Brianza (1) and Milano (1).

The entry belongs to chapter 17 of the European List of Waste (Decision 2000/532/EC). It is not worded as a mirror entry, but it has a hazardous counterpart: glass containing or contaminated with dangerous substances goes to entry 17 02 04*, which also covers wood and plastic in the same condition. The chapter looks at origin: packaging glass has code 15 01 07 and glass leaving a sorting plant has code 19 12 05.

Managing waste with code 17 02 02

It is non-hazardous waste from a production activity, but the producer must rule out contamination that would move the material to entry 17 02 04*: glass treated with paints or films containing dangerous substances, residues of hazardous sealants or putties, glass mixed with asbestos-containing materials. Separation on site is the precondition for recovery: glass collected together with inert materials, wood and metals ends up in mixed construction and demolition waste and loses its own recovery route.

Storage on site before collection follows the time and quantity limits set by the Member State; under the Landfill Directive (1999/31/EC), storing waste for more than three years before recovery counts as landfilling. It should be kept in dedicated skips, separated by type where possible, that is monolithic, laminated and insulating units, away from inert materials and plastics that impair recovery, and handled with attention to cutting hazards. Frames and hardware should be removed first, if the site allows.

Construction glass need not be waste either: clean, homogeneous installation offcuts can be managed as a by-product if the conditions of Article 5 of Directive 2008/98/EC are met, and after a recovery operation meeting Article 6 the cullet ceases to be waste. On Sfridoo every listing states the classification chosen. Flat glass has a narrower recovery chain than packaging glass: clean cullet of a single type is easier to place, while glass with frames and interlayers needs treatment first.

Treatment and recovery

Glass recovery is operation R5 of Annex II to Directive 2008/98/EC, recycling or reclamation of other inorganic materials, usually preceded by storage pending recovery, R13. The destinations are two: furnace-ready cullet for the glass industry, obtained by sorting, crushing and removal of metals and opaque bodies, and raw materials for construction. Where the Member State provides exemptions from the permit requirement under Articles 24–25 of the directive, this recovery can take place under that simpler regime; otherwise the plant needs a permit under Article 23.

Insulating units must be opened and stripped of spacers and sealants, laminated glass must be separated from its plastic interlayer in dedicated plants, and tempered glass shatters into granules that are easier to process. Cullet meeting the criteria of Regulation (EU) No 1179/2012, which also admits flat glass as input, ceases to be waste and returns to furnaces for flat glass, container glass or fibres; lower-quality material becomes glass sand, aggregate or cellular glass. Article 11(2)(b) of Directive 2008/98/EC set a 70% by weight target for 2020 for material recovery of non-hazardous construction and demolition waste.

For whoever hands over the glass, the information that matters is the type of glass, the presence of frames, hardware and sealants, and any patterned, wired or tinted glass, which not every plant accepts in cullet intended for flat glass. A precisely described lot avoids collections that the plant then cannot process.

Regulatory obligations

Under Article 35 of Directive 2008/98/EC, the duty to keep a chronological record of quantity, nature, origin, destination, collection frequency, mode of transport and treatment method falls on producers of hazardous waste, on undertakings that treat waste and on those that collect, transport, deal in or broker hazardous waste. A site producing only non-hazardous glass is therefore not bound by it at EU level, although the Member State may extend the duty, and many run electronic registries; carriers and plants keep their own records, and the producer keeps one for its own hazardous waste. Each shipment travels with the transport document required by national rules, which states the site of origin as the place of production, and annual reporting is set by the Member State. If the glass is shipped to another country, Regulation (EU) 2024/1157 on shipments of waste governs the procedure; it applies from 21 May 2026 and replaces Regulation (EC) No 1013/2006.

Undertakings that collect or transport the glass professionally must be registered under Article 26 of Directive 2008/98/EC; whether a building contractor carrying its own waste needs the same registration depends on the rules of the Member State. The receiving plant must be authorised for the code and the operation, through a permit under Article 23 of the directive or an exemption under Articles 24–25 where the Member State provides one. For construction glass, characterisation is usually a description of the type of glass and of the works it comes from; an analysis is needed when contamination is suspected that would move the waste to the hazardous entry.

Other codes in sub-chapter 17 02

Published listings

Frequently asked questions

  • Who collects glass under code 17 02 02?

    Construction and demolition glass under code 17 02 02 is collected by flat glass treatment plants, which separate interlayers, sealants, spacers and frames, and by recoverers who turn it into furnace-ready cullet for the glass industry or into building materials such as glass sand, aggregate and cellular glass. The type of glass — monolithic, laminated, insulating unit, wired — decides who can work it, because every foreign component has to be removed before melting. The plant must be authorised for the code and for operation R5 of Annex II to Directive 2008/98/EC, usually preceded by storage pending recovery, R13. Declaring the type of glass, any frames and the quantity in the listing helps find the right plant at first contact.

  • What is the difference between 17 02 02 and 19 12 05?

    The difference between 17 02 02 and 19 12 05 is the producer of the waste. 17 02 02 arises on site, from construction, renovation or demolition — removed windows, glazing, panes broken during installation — and the producer is the contractor carrying out the works. 19 12 05 is glass leaving a waste treatment plant, already sorted at least once, and the producer is the plant. The same glass can therefore move from one to the other by passing through a sorting facility. For a buyer quality matters most: a 19 12 05 lot may already arrive more homogeneous, while a 17 02 02 lot may still contain frames, sealants and site residues.

  • Can insulating glass units be delivered whole?

    An insulating glass unit can be delivered whole only if the receiving plant is equipped to dismantle it. An insulating unit is made of two or more panes joined by a spacer, often metallic, and by organic sealants: components that have to be separated before the glass becomes cullet for the furnace, and not every flat glass treatment plant does that. If the panes are also laminated, that is with a plastic interlayer, processing becomes harder still. Declaring in the listing the type of glass, any frames and the quantity of insulating units avoids a collection that cannot then be processed, and lets the plant say straight away whether it accepts them whole or dismantled.

Not finding what you are looking for?

Post a request

Tell us which material you need: we also look among materials not yet published.

Offer a material

Do you have a residue your company does not use? Describe it: a Sfridoo technician checks it before it appears among the listings.

EWC code 17 02 02: glass from construction and demolition | Sfridoo