Published listings
See all 25 listings- SellSurplus stock
- SellSurplus stockConstruction materialsMGN Anti-Salt Pozzolanic Undercoat Plaster for Green Building/Restoration3,600 kg/year500.00 €/tonneBiella (BI)One-time
- SellSurplus stock
- SellSurplus stockConstruction materialsDiathonite Evolution Diasen Thermal Insulating Biomortar3,024 kg/year1,600.00 €/tonneBiella (BI)One-time
- SellSurplus stockConstruction materialsNigra Padoana MGN Plaster—An Ancient Palladian Recipe1,125 kg/year562.00 €/tonneBiella (BI)One-time
- SellBy-productConstruction materialsSUB-PRODUCT: WET MIX OF CLAY AND GROUND ROCK130,000 kg/year1.00 €/tonneFirenze (FI)Constant
- SellSurplus stockConstruction materialsTRISO-BARDAGE Heat-Reflective Insulation1,000 kg/year1,125.00 €/tonneBergamo (BG)One-time
- SellSurplus stock
- SellSurplus stockConstruction materialsEPS 100 EXTERIOR WALL INSULATION, 12 CM THICK1,000 kg/year12.00 €/tonneBergamo (BG)One-time
- Construction materialsAutoclaved Aerated Concrete Byproduct3,000,000 kg/yearPrice on requestPiacenza (PC)One-time
- Construction materials10 12 08Porcelain stoneware and majolica200 kg/yearPrice on requestPerugia (PG)Constant
- Construction materials12 01 05Solid surface made of minerals and resin4,000 kg/yearPrice on requestSiracusa (SR)Constant
- No photograph for this listingWasteConstruction materialsConstruction Waste, Stones, and Debris1,000 kg/yearPrice on requestMilano (MI)Constant
- No photograph for this listingWaste
- Construction materials17 09 03*Demolition Debris3,000,000 kg/yearPrice on requestCampobasso (CB)Constant
- Construction materialsInert material for backfill4,000,000 kg/yearPrice on requestCosenza (CS)Constant
The construction materials passing through this catalogue are two different things. On one side site and production waste — bricks, concrete, ceramics, plasterboard, insulation, membranes — on the other surplus never installed: end-of-run tiles, sanitaryware, window units, panels and lots left in the warehouse after a design change. The second group is not waste and never was.
As of 25 November 2026, Sfridoo has 25 published listings in the “Construction materials” category. By legal classification: 10 as surplus stock, 9 as waste, 3 as by-product and 3 as secondary raw material. Most frequent provinces: Biella (4), Bergamo (2) and Cosenza (2).
Construction is the largest waste-generating activity in the European Union: 862.2 million tonnes in 2022 out of 2,225.7 million across all activities and households, according to Eurostat, with 302.4 million tonnes of mineral construction and demolition waste. The Waste Framework Directive set a target of 70% preparing for re-use, recycling and other material recovery of non-hazardous construction and demolition waste by 2020. It is also the stream where distance to the receiving site weighs most, because the material is heavy and low in unit value.
Framing in this category splits almost evenly between waste and surplus stock, and the difference is substantial: a pallet of tiles never installed is unsold product and is sold as such, while a pile of rubble is waste and follows waste law until a recovery operation brings it out of waste status under art. 6 of Directive 2008/98/EC. On Sfridoo the framing is stated on every listing.
Frequently asked questions
Who buys construction material scrap and surplus?
Construction material scrap and surplus have different buyers depending on condition. Construction firms and merchants buy surplus never installed; crushing and inert recovery plants receive rubble and concrete; producers of recycled aggregates use them for sub-bases and embankments; reuse operators look for intact window units, sanitaryware and demountable components. The pool is the largest of all: construction generated 862.2 million tonnes of waste in the European Union in 2022, according to Eurostat, including 302.4 million tonnes of mineral construction and demolition waste.
Which processes generate construction material scrap?
Construction material scrap comes from four sources. Demolition and renovation sites produce rubble, bricks, concrete and ceramics; building materials manufacturing leaves out-of-tolerance pieces, end-of-firing and line scrap; warehouses and merchants hold end-of-run stock, discontinued lots and returns; sites with design changes leave material never installed. The source matters because it separates two worlds: material never installed is product that can be resold, while material removed from a structure is normally waste and follows the recovery route.
Is construction scrap waste or surplus stock?
It depends on whether it was installed. Material that never went into the works is unsold product and is treated as such. Material removed from a structure is normally waste, and can become recycled aggregate only after a recovery operation that meets the conditions of art. 6 of Directive 2008/98/EC.
Which EWC codes recur on construction materials?
The codes sit in chapter 17, construction and demolition wastes, and are assigned by material: 17 02 01 wood, 17 02 02 glass, 17 02 03 plastic, and the brick and concrete codes for the mineral fraction. The code applies only where the material is classified as waste: on surplus stock it does not exist.
How do I list construction materials?
A listing of construction materials is published by filling in the Sfridoo proposal form with material, whether it was installed, quantity, province where it is held and legal framing; the EWC code is given only if the material is classified as waste. It pays to state format, quantity per item and whether packaging is intact, because a complete end-of-run sells better than mixed leftovers. The listing does not go live on its own: it enters an internal review queue, a technician checks it and may correct it, and whoever proposed it receives the outcome by email. The public listing shows neither the company name nor contact details: anyone interested sends an offer or a request for information from the listing. Listing is free.
What determines the value of reclaimed construction material?
The integrity and uniformity of the lot: a complete end-of-run of tiles in a single format sells, a mixed pallet of leftovers does not. For the mineral fraction, separation from foreign material counts, and above all distance from the plant, because on a heavy low-value material transport decides the deal.
Not finding what you are looking for?
Tell us which material you need: we also look among materials not yet published.
Do you have a residue your company does not use? Describe it: a Sfridoo technician checks it before it appears among the listings.
