
High-density SBR+EPDM+EVA powder
Secondary raw material (End of Waste). 50,000 kg/year. Novara (NO) — Piedmont.
If desired, through our business, it is possible to pick it up in the form of granules or powder as an “End of Waste” product in big bags or smaller bags. The shipping cost and the price listed in this ad are not indicative, as they vary depending on the distance and the…
Read moreShow less
If desired, through our business, it is possible to pick it up in the form of granules or powder as an “End of Waste” product in big bags or smaller bags.
The shipping cost and the price listed in this ad are not indicative, as they vary depending on the distance and the size/packaging of the material you wish to pick up.
- Quantity
- 50,000kg/
year - Price
- Price on request
- Production
- Constant



















